Chapter 7
Decommisioning
In the event that the machine must be decommissioned, follow these steps:
1. Clean interior of machine, both basket and shell.
2. Disconnect electrical power.
(a) Shut of main power supply at the breaker box or main control panel.
(b) Do not attempt to disconnect power supply wires from power supply. Have a qualified
electrician disconnect power to machine at its source.
3. Disconnect gas/steam supply.
4. Disconnect exhaust system.
5. Remove the machine from its foundation pad.
(a) Keep all panels in place to provide stability when moving the machine.
(b) Verify that door is closed and secure
(c) Place the machine on skid and bolt the frame to the skid. This will facilitate the removal
of the machine on to a truck.
6. Recycle.
The manufacturer uses the highest quality material in their products so that those material may be
recycled at the end of the product’s service life.
38
Summary of Contents for DE Series
Page 1: ...Dryer DE Series Installation and Operation Manual March 17 2014 Revision 1 7 ...
Page 5: ...Figure 1 1 DE Product Family 2 ...
Page 12: ...Figure 3 1 DE Gas General Specifications 9 ...
Page 13: ...Figure 3 2 DE 30 Utility Connections 10 ...
Page 14: ...Figure 3 3 DE 50 75 Utility Connections 11 ...
Page 15: ...Figure 3 4 DE 120 Utility Connections 12 ...
Page 16: ...Figure 3 5 DE 170 Utility Connections 13 ...
Page 25: ...Figure 3 14 DE Series Bulkhead Installation Details 22 ...
Page 33: ...Figure 5 1 Simplified Call for Heat Path 30 ...
Page 34: ...Figure 5 2 Detailed Call for Heat Path 31 ...
Page 35: ...Figure 5 3 Call for Heat Path Schematic Figure 5 4 Mechanical Timer Start Path 32 ...