i. The steam damper should not ”slam” (open or closed) when it reaches the end
of (piston) travel. Additionally, the steam damper should not bind and/ or stop
during travel. If either of these conditions occur, the flow control must be adjusted.
Make a complete operational check of ALL safety-related circuits (i.e., lint drawer switch, and sail
switch on gas models).
IMPORTANT: The drying cylinder is treated with a protective coating. Tumble old clothes or
material in the basket (tumbler), using a mild detergent to remove the protective coating.
Each dryer should be operated through one complete cycle to assure that no further adjustments
are necessary and that ALL components are functioning properly.
Make a complete operational check of ALL operating controls.
1. Microprocessor controller (computer) programs/selections.
(a) Each microprocessor controller has been preprogrammed by the factory with the most
commonly used program selections. A listing of factory programs is provided in the
control manual, shipped with the machine. If computer program changes are required,
refer to the control’s programming manual which was shipped with the dryer.
2. Dual timer dryers check.
(a) Heating Timer
(b) Cool Down Timer
(c) Temperature Selection Switch
Note: You must program cool down time in order to start the dryer.
4.2
Operating Instructions
NOTE: Before attempting to start the dryer make sure that the main door is closed and the lint
drawer is securely in place.
1. Microprocessor Dryer
(a) Clean lint filter.
(b) Open the front door for loading and close the front door.
(c) Choose a program, then push ”START”. The machine will start the operation when the
program finishes.
2. Dual Timer Dryer
(a) Clean lint filter.
27
Summary of Contents for DE Series
Page 1: ...Dryer DE Series Installation and Operation Manual March 17 2014 Revision 1 7 ...
Page 5: ...Figure 1 1 DE Product Family 2 ...
Page 12: ...Figure 3 1 DE Gas General Specifications 9 ...
Page 13: ...Figure 3 2 DE 30 Utility Connections 10 ...
Page 14: ...Figure 3 3 DE 50 75 Utility Connections 11 ...
Page 15: ...Figure 3 4 DE 120 Utility Connections 12 ...
Page 16: ...Figure 3 5 DE 170 Utility Connections 13 ...
Page 25: ...Figure 3 14 DE Series Bulkhead Installation Details 22 ...
Page 33: ...Figure 5 1 Simplified Call for Heat Path 30 ...
Page 34: ...Figure 5 2 Detailed Call for Heat Path 31 ...
Page 35: ...Figure 5 3 Call for Heat Path Schematic Figure 5 4 Mechanical Timer Start Path 32 ...