BURNER CONNECTION TO THE BOILER
HEAD UNIT ASSEMBLY
•
Adjust the position of the coupling flange (19) by loosening the
screws (6) so that the burner head enters the furnace to the extent
recommended by the generator manufacturer.
•
Position the insulating gasket (13) on the sleeve, by inserting the
cord (2) between the flange and the gasket.
•
Anchor the flange of the head unit (15) to the boiler (1) with the stud
bolts, washers and nuts provided (7)
CAUTION / WARNINGS
Completely seal the space between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLING THE GAS TRAIN
The gas train can be assembled in different ways: (8), (8a) .
Choose the most rational position for the set-up of the boiler room and
the position in which the gas pipe arrives.
10 / 30
0006160096_202206
ENGLISH
Summary of Contents for TBG 35 MC
Page 2: ......
Page 31: ...SCHEMI ELETTRICI 29 30 0006160096_202206 ITALIANO...
Page 61: ...WIRING DIAGRAMS 29 30 0006160096_202206 ENGLISH...
Page 63: ......