59 /
000608006_2007/06
Control programme
t
4
5s
Putting control circuit under atmospheric pressure
t
6
7,5s
Time between start-up and energizing of main “
AR
” relay
t
1
22,5s
1st verification stage at atmospheric pressure
t
3
5s
Putting control circuit gas under pressure
t
2
27,5s
2nd verification stage at gas pressure
t
5
67,5s
Total time of tightness control, up to burner operation consent
t
20
22,5s
Return of programmer to rest position = fresh verification is enabled
AL
remote alarm signalling
AR
main relay with “ar” contacts
AS
equipment fuse
BR
blocking relay with “ar” contacts
DW outer pressure switch (tightness control)
EK... unblocking button
GP
outer pressure switch (for mains gas pressure)
HR
auxiliary relay with “ar” contacts
L
equipment trouble signalling lamp
SK
line switch
I...XI programmer cam contacts
Course of programme
Terminals activated by
equipment or by electric
connections
LDU 11.. GAS VALVE TIGHTNESS CONTROL EQUIPMENT
Summary of Contents for GI 350 DSPGN
Page 2: ......
Page 109: ...107 111 0006080106_2007 06 ...
Page 110: ...108 111 0006080106_2007 06 ...
Page 111: ...109 111 0006080106_2007 06 ...
Page 112: ...110 111 0006080106_2007 06 ...
Page 113: ...111 111 0006080106_2007 06 ...