PARTS REQUIRED:
EAVE SIDE SOFFITS
Position
72"
soffi t board
primed
side down
fl ush to front gable soffi t
(Fig A)
and rafter end
(Fig B)
.
Secure using 2" fi nish nails, two in
each rafter. Toenail at center seam
(Fig. C)
.
Position
96"
soffi t board
primed
side down
fl ush to
72"
soffi t board
(Fig C)
and rafter end
(Fig B)
.
Secure using 2" fi nish nails, two in
each rafter. Toenail at center seam
(Fig. C)
.
Position
25-1/2"
soffi t board
primed
side down
fl ush to
96"
soffi t board
(Fig C)
, fl ush to rafter end
(Fig B)
,
and fl ush to back gable soffi t
(Fig A)
.
Secure using 2" fi nish nails, two in
each rafter. Toenail at center seam
(Fig. C)
.
Repeat STEPS 1 - 3 to attach eave side soffi t boards on the opposite side.
Ensure soffi t boards are fl ush at rafter ends (Fig. B) and fl ush at seams
.
x44
2" (5,1 cm)
4
2
3
1
BEGIN
You have fi nished installing your eave side soffi t panels.
FINISH
5
Primed Side Down
Fig. A
2" (5,1 cm) Finish Nails
Flush
Fig. B
Flush
Flush
Flush
Flush
Fig. C
TOENAILING
x2
3/8 x 5-7/8 x25-1/2" (1 x 14,9 x 64,8 cm)
x2
3/8 x 5-7/8 x 72" (1 x 14,9 x 182,9 cm)
x2
3/8 x 5-7/8 x 96" (1 x 14,9 x 243,8 cm)
72"
(182,9 cm)
96"
(243,8 cm)
25-1/2"
(64,8 cm)