Set gable wall
on floor and secure using one 2" screw on each side
(Fig A)
.
1
ENSURE TOP WALL FRAMES ARE FLUSH.
2
26
3" (7,6 cm)
GABLE WALL INSTALLATION
2" (5,1 cm)
x48
x2
x28
1-1/2" (3,8 cm)
PARTS REQUIRED:
3" (7,6 cm)
x10
2" (5,1 cm)
x4
BEGIN
Remove Temporary Supports
and stand gable wall on floor.
It is important to secure the gable wall in the following order:
Fig. B
2"
(5,1 cm)
Screw
2"
(5,1 cm)
Screw
Flush
Flush
Fig. A
2" (5,1 cm)
Screw
Flush
Flush
Flush
Move to the bottom of gable wall and secure bottom of wall using one 2" screw into eave
wall bottom plate
(Fig B)
.
ENSURE WALL PANELS ARE FLUSH BEFORE SECURING.
2" (5,1 cm)
Screw