30
GABLE ASSEMBLIES
PARTS REQUIRED:
PVA
PVA
Ensure gable panels are flush at peak of ladder and flush along top edge of
ladder assembly. Secure using 1-5/8" screws as shown
(Fig. E)
.
8
7
9
10
Orient gable and ladder assemblies as shown
(Fig. E)
. You will build
TWO
complete assemblies.
3" (7,6 cm)
x8
Fig. E
Fig. F
x2
Gable Assemblies
Flush
Flush
Flush
Flush
3"
(7,6 cm) Screws
Attach
PVA
to ladder assembly using 3" screws
(Fig. F)
.
Repeat
Steps 7-9
to build the other gable assembly.
x2
Ladder Assemblies
x4
2 x 4 x 5-7/8"
(5,1 x 10,2 x 14,9 cm)
PVA
Flush
FINISH
11
You have finished building two gable units.
x36
1-5/8" (4,1 cm)
1-5/8"
(4,1 cm)
Screws