37
PARTS REQUIRED:
GABLE END SOFFITS
Position right
73-5/16"
overhang board
Primed Side Down
flush to front wall
(Fig A)
and gable panel seam
(Fig B)
. Secure using twelve 2" finish nails.
Position left
73-5/16"
overhang board
Primed Side Down
flush to front wall
(Fig C)
,
gable end and right overhang board
(Fig. D)
. Secure using twelve 2" finish nails.
Repeat
Steps 1-2
to attach soffit boards on the opposite side.
Ensure soffit boards are flush at seam (Fig. B) and flush at peak (Fig. D)
.
x4
3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm)
x72
2" (5,1 cm)
2
3
1
BEGIN
You have finished installing your soffit panels.
FINISH
4
Primed Side Down
Flush to wall.
Fig.C
Center and Flush
at peak.
Fig. D
8"
(20,3 cm)
Primed Side Down
Flush to wall.
Fig. A
Fig. B
8"
(20,3 cm)
2" (5,1 cm) Nails
x12 per side
Flush at
center seam.
Flush
Flush