Secure top of wall using one 2" screw into top plate
(Fig A)
.
24
PARTS REQUIRED:
3" (7,6 cm)
x3
2" (5,1 cm)
x25
FRONT WALL INSTALLATION
2" (5,1 cm)
x2
x14
1-1/2" (3,8 cm)
Fig. A
Flush
STEP
3
FIRST
SCREW
BEGIN
Stand front wall on floor.
Center FRONT WALL assembly on the 144" (365,8 cm)
floor dimension.
Use
OO
as a temporary brace.
Secure with two 3" screws.
2
1
3" (7,6 cm)
Screws
DOOR
OO
Panel
Flush
144"
(365,8
cm)
Nail gable wall panel to front wall stud using
1-1/2" nails 6" apart
(Fig. B)
.
5
6
3
ENSURE GABLE AND FRONT WALL
PANELS ARE FLUSH BEFORE SECURING.
6" (15,2 cm)
Fig. B
1-1/2"
(3,8 cm)
Nails
Fig. C
BE SURE TOP OF WALL FRAMES ARE FLUSH.
2"
(7,6 cm)
Screw
2" (5,1 cm)
Screw
OO
x1
1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
4
Move to the bottom of gable wall and secure
bottom of wall using one 2" screw into front
wall bottom plate
(Fig A)
.
Flush
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
Secure gable wall top frame 2 x 4 using one 3" screw
toe-screwed into front wall frame at an angle as
shown
(Fig. C)
.
STEP
4
SECOND
SCREW