25
PARTS REQUIRED:
Nail lower edge of panels to floor frame using 2" nails 6" apart. Angle nail to hit floor frame
(Fig. D)
.
7
Secure front wall bottom plates to floor using 3" nails
(Fig. D)
.
Remove temporary braces.
8
9
3" (7,6 cm)
x8
2" (5,1 cm)
x16
FRONT WALL INSTALLATION
3" (7,6 cm)
Nails
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. D
DOOR
You have finished standing your FRONT WALL.
FINISH
10
6"
(15,2 cm)