60
CENTER OF
WINDOW
CENTER OF
WINDOW
PARTS REQUIRED:
x16
2" (5 cm)
WINDOW TRIM
4
FINISH
Your windows and window trim are now installed.
5
Place
DT
fl ush to
AZ
(Fig. C)
and center trim
horizontally on window.
Secure with 2" fi nishing nails.
Nail into window frame and studs behind.
Repeat to install 2nd DT.
11-3/8"
(28,9 cm)
11-3/8"
(28,9 cm)
Fig. B
2" fi nishing nails
into wall frame.
CENTER OF
WINDOW
CENTER OF
WINDOW
Place the inside edge of
AZ
11-3/8" apart
from the center of window, as shown
(Fig. B)
.
Center trim vertically on window.
Secure with 2" fi nishing nails at locations shown.
Nail into window frame and studs behind.
DT
DT
AZ
2" Finishing nails
Flush
Flush
Flush
Flush
Fig. C
AZ
19/32 x 2-1/2 x 28-1/8" (1,5 x 6,3 x 71,4 cm)
x2
DT
19/32 x 2-1/2 x 30-1/8" (1,5 x 6,3 x 76,5 cm)
x2
AZ