55
ZJ
x1
5/8 x 3 x 72" (1,6 x 7,6 x 183 cm)
ZJ
Keep aligned.
Keep aligned.
CAUTION! Do not nail into window fl ange!
2" (5 cm)
PARTS REQUIRED:
WINDOWS
Install 3/4
"
(1,9 cm) screws
from inside.
3/4" (1,9 cm)
4
5
Install
ZJ
centered over windows. Secure with (7) 2" fi nishing nails into framing.
Do not nail into window fl ange.
From inside, install 3/4" screws into
ZJ
and outer (2)
EY.
Do not screw into window fl ange.
You have fi nished installing your windows.
CAUTION! Do not screw into window fl ange!
INSIDE OF SHED
OUTSIDE OF SHED
FINISH
x10
x7
Flush
Flush
Flush