29
3
Secure the bottom plate with (2) 3" nails
between the wall studs.
Secure back wall horizontal supports with 3" screws
(Fig. E
,
F)
into side wall corner stud.
Remove temporary brace.
Repeat process to secure the left side wall.
2
Ensure the measurement between
the panel edges is the same along the
entire length.
Secure wall with (1) 2" nail in the upper
corner
(Fig. B)
.
Secure the back wall panel edge to the
side wall stud with 2" nails spaced 6"
apart.
Secure the bottom of panel with
2" nails spaced 6" apart.
Angle nails into fl oor frame
(Fig. C)
.
3" (7,6 cm)
Nail
Center side wall on fl oor front to back.
Secure the lower back wall corner to
the side wall frame with (1) 2" nail
(Fig. A)
.
BEGIN
1
CENTER
DOOR
Fig. A
2" (5 cm)
Nail
6"
(15 cm)
Fig. C
Fig. B
2" (5 cm)
Nail
6"
(15 cm)
Fig. E
Fig. F
3" (7,6 cm)
Screw
Your side walls are now installed.
FINISH
SIDE WALLS INSTALLATION
2" (5 cm)
3" (7,6 cm)
3" (7,6 cm)
SAME
MEASUREMENT
x4
x24
x84