PAGE 37
STEP 18
(Pilot drill with 3/16” drill bit when
using Lag Screws)
Attach M1 Wall Rail to B4 and B5 Club
House Legs with 5/16”x 2” Lag Screws,
5/16” Lock Washers and
Washers
flush with bottom of G8.
Now attach M5 Wall Rail to B5 Clubhouse
Legs on left side of Structure using
5/16”x 2” Lag Screws, 5/16” Lock
Washers and
Washers.
Now, attach a M5 Wall Rail Flush with Top
of Clubhouse Legs on both the left and
right side of structure with 5/16”x 2” Lag
Screws, 5/16” Lock Washers and
Washers
.
Fender
Fender
Fender
H2
M1
M5
B4
B5
B5
B4
M5
M5
B4
B5
B4
B5
Top Floor
M1
M5
G8
ITEMS NEEDED
(1) M1 Wall Rail
(3) M5 Wall Rail
HARDWARE NEEDED
(8) 5/16” x 2” Lag Screw
(8) Fender Washer
(8) 5/16” Lock Washer
Summary of Contents for Highlander 6010
Page 14: ...PAGE 12 WOODEN PARTS A1 E4R...
Page 15: ...PAGE 13 WOODEN PARTS E5L G8...
Page 16: ...PAGE 14 WOODEN PARTS H1 H15...
Page 17: ...PAGE 15 WOODEN PARTS H16 M6...
Page 18: ...PAGE 16 WOODEN PARTS M7 R1...
Page 19: ...PAGE 17 WOODEN PARTS R2L T1...