PAGE 22
STEP 2
Attach G4 Wall Rail to B1 Front Tower Legs using
5/16”x 4” Hex Bolts, 5/16” Lock Washers,
and
5/16” Spike T-Nuts.
Attach G7 Floor Rail to top of B3 Back Tower Legs with
5/16”x 4” Hex Bolts, 5/16” Lock Washers,
and 5/16” Spike T-Nuts.
Attach another G7 Floor Rail to Bottom of B3 Back Tower
Legs with 5/16” x 2-3/8” Lag Screws, 5/16” Lock Washers and
and last G7 Floor Rail to B2 Middle Tower
Legs. (Note: Position Between B1 and
B2 Tower Legs
). Pilot
Drill and secure with 5/16”x 2-3/8” Lag Screws, 5/16” Lock
Washers and
.
Attach G6 Base Board to B1 Front Tower Legs using
5/16” x 2-3/8” Lag Screws, 5/16” Lock Washers and
.
( Pilot drill using 3/16” drill bit. )
Fender Washers
Fender Washers
Fender Washers
Fender Washers
Fender
Washers
G4
G7
B1
B2
B3
B1
B2
B3
G7
G6
G7
G7
B1
B1
B2
B3
B1
B1
G4
G7
ITEMS NEEDED
(1) G4 Wall Rail
(3) G7 Floor Rails
(1) G6 Base Board
HARDWARE NEEDED
(4) 5/16 X 4" Hex Bolts
(12) 5/16 X 2 3/8 Lag Screws
(16) Fender Washers
(16) 5/16" Lock Washers
(4) 5/16" Spike T Nut
Summary of Contents for Highlander 6010
Page 14: ...PAGE 12 WOODEN PARTS A1 E4R...
Page 15: ...PAGE 13 WOODEN PARTS E5L G8...
Page 16: ...PAGE 14 WOODEN PARTS H1 H15...
Page 17: ...PAGE 15 WOODEN PARTS H16 M6...
Page 18: ...PAGE 16 WOODEN PARTS M7 R1...
Page 19: ...PAGE 17 WOODEN PARTS R2L T1...