B1
B2
B3
G2
G3
H11
H11
PAGE 21
STEP 1
B e g i n b y i n s e r t i n g 5 / 1 6 ” S p i k e T- N u t s i n To w e r L e g s
(Per Dia.). Then attach G3 Floor Rail to top of B1 Front, B2 Middle and B3 Back
Tower Legs using 5/16”x 4” Hex Bolts,
and Fender Washers. (Note:
Position of small pilot holes in
G3 Floor Rail
between B2 and B3 Tower Legs and
towards top).
Attach H11 Floor Rail to B1 and B2 and another H11 Floor Rail to B2 and B3 with
5/16”x 4” Hex Bolts, 5/16” Lock Washers and
Washers into the 5/16” Spike T-
Nuts inserted earlier.
Use Holes in G2 Base Board to Pilot Drill B1, B2 and B3 Tower Legs with 3/16” Drill
Bit. Now attach using 5/16”x 2-3/8” Lag Screws, 5/16” Lock Washers and
.
Repeat Step to construct opposite tower side.
Lock Washers
Fender
Fender
Washers
G3
H11
H11
G2
B1
B2
B3
B1
B2
B3
ITEMS NEEDED
(2) G3 Floor Rail
(4) H11 Floor Rail
(2) G2 Base Board
(2) B1 Front Tower Legs
(2) B2 Middle Tower Legs
(2) B3 Back Tower Legs
HARDWARE NEEDED
(22) 5/16 X 4" Hex Bolts
(12) 5/16 X 2 3/8" Lag Screws
(34) Fender Washers
(34) Lock Washers
(22) Spike T Nut
Summary of Contents for Highlander 6010
Page 14: ...PAGE 12 WOODEN PARTS A1 E4R...
Page 15: ...PAGE 13 WOODEN PARTS E5L G8...
Page 16: ...PAGE 14 WOODEN PARTS H1 H15...
Page 17: ...PAGE 15 WOODEN PARTS H16 M6...
Page 18: ...PAGE 16 WOODEN PARTS M7 R1...
Page 19: ...PAGE 17 WOODEN PARTS R2L T1...