PAGE 26
STEP 6
Attach H7 Floor Joists to H11 Floor Rails using 2-1/2” Wood
Screws.
Now, attach four (4) SC1 Floor Boards two (2) between B2 and
B3 Tower Legs on lower floor and two (2) between B1 and B2
Legs on middle floor using 1-1/2” Wood Screws.
Attach fifteen (15) M3 Floor Boards and one (1) N2 Floor
Board to lower floor with 1-1/2” Wood Screws and fifteen (15)
M6 Floor Boards and one (1) N4 Floor Board to middle floor
with 1-1/2” Wood Screws.
(Note: space evenly).
N4
N2
M3
M6
B3
B3
B2
B2
B1
B1
SC1
SC1
SC1
SC1
B1
B1
B2
B2
B3
B3
B1
B2
B3
B1
B2
B3
H5
H7
H5
H7
H6
ITEMS NEEDED
(2) H7 Floor Joists
(4) SC1 Floor Boards
(15) M3 Floor Boards
(15) M6 Floor Boards
(1) N2 Floor Boards
(1) N4 Floor Boards
HARDWARE NEEDED
(8) 2 ½” Wood Screws
(172) 1 ½” Wood Screws
Summary of Contents for Highlander 6010
Page 14: ...PAGE 12 WOODEN PARTS A1 E4R...
Page 15: ...PAGE 13 WOODEN PARTS E5L G8...
Page 16: ...PAGE 14 WOODEN PARTS H1 H15...
Page 17: ...PAGE 15 WOODEN PARTS H16 M6...
Page 18: ...PAGE 16 WOODEN PARTS M7 R1...
Page 19: ...PAGE 17 WOODEN PARTS R2L T1...