
7-35
Operation & Maintenance Manual
Doc. Ref. MNGRM2CO2 REV. 3
The calibration procedure to be conducted as follows:
1. Open the sensor enclosure and locate Pot VR201 on the sensor PCB. VR201 is used to adjust
the zero point (refer to the picture below).
2. Monitor the output between 0V (negative) and VS (positive).
3. Adjust Pot VR201 to 0V or slightly positive (0.01 V is acceptable).
4. Locate Pot VR202 which is used to calibrate the range (span) of the sensor (refer to the picture
below).
5. Monitor the output between 0V (negative) and VS (positive).
6. Expose the sensor to calibration gas and allow to stabilize (approximately 6 minutes).
7. Adjust pot VR202 to the voltage calculated on the previous page.
Summary of Contents for Parasense GRM2 CO2 Series
Page 7: ...1 2 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 GENERAL ARRANGEMENT...
Page 14: ...2 7 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 NETWORK MODULE CONNECTIONS...
Page 74: ......
Page 75: ......
Page 76: ...2 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 GRM2 CO2 CONNECTION SCHEMATICS PS0748...
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...3 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 ADC 104 GENERAL ARRANGEMENT PM2098...
Page 83: ......
Page 84: ...4 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 ADC 104 PANEL MOUNTING DETAILS PM2247...
Page 85: ......
Page 86: ...5 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 ADC 104 CONNECTION SCHEMATIC PS0753...
Page 87: ......
Page 88: ......
Page 89: ......
Page 91: ......
Page 93: ......
Page 95: ......
Page 96: ......