background image

RIGGING AND

INSTALLATION INSTRUCTIONS

1

R_TSU-C/Dv00 EN

TSU-C/D for External Melt

ICE CHILLER

®

Thermal Storage Unit

TSC-C/D for External Melt

ICE CHILLER

®

Thermal Storage Coil only

The BAC equipment should be rigged and installed as
outlined in this bulletin.
These procedures should be thoroughly reviewed prior to
the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all
necessary equipment will be available at the jobsite.

Be sure to have a copy of the unit certified drawing
available for reference. If you do not have a copy of this
drawing or if you need additional information about this
unit, contact the local BAC Balticare representative. His
name and phone number can be found on the BAC
website: 

www.BaltimoreAircoil.eu

. The model type and

serial number of your equipment are indicated on the unit
nameplate.

Table of Contents

Page

General Information

2

Rigging

4

Inspection Prior to Start-up

8

Recommended Maintenance and 
Monitoring Programme

12

Summary of Contents for Ice Chiller TSC-1050C

Page 1: ...nd to assure that all necessary equipment will be available at the jobsite Be sure to have a copy of the unit certified drawing available for reference If you do not have a copy of this drawing or if...

Page 2: ...lifting when available hoisting capacity provides little margin for safety Before an actual lift is undertaken ensure no water snow ice or debris has collected in the sump or elsewhere in the unit Su...

Page 3: ...g on operating equipment be aware that some parts may have an elevated temperature Any operations on elevated level have to be executed with extra care to prevent accidents Air piping between air pump...

Page 4: ...pported on a level concrete pad After the unit is set into final position the tank bottom should be sealed airtight all around to prevent condensation formation see figure The sealer is shipped loose...

Page 5: ...ifting methods not permitted Model TSU C D L x W Dimensions Approx Shipping weight kg A mm B mm C mm TSU 95C TSU 115C 3073 x 1308 3683 x 1308 2550 2780 1597 2403 738 640 1124 1124 TSU 120C TSU 145C TS...

Page 6: ...on and corrosion REFRIGERANT CONNECTIONS ON SITE All connections in the external pipework installed by others must be leak free and tested accordingly All piping external to BAC cooling equipment must...

Page 7: ...local BAC representative 1 Non return valve 2 Steel pipe for initial 3m then PVC for remainder of air supply by others 3 Filter 4 Air pump Whenever TSC coils are to be installed in a concrete tank the...

Page 8: ...in the Operating and Maintenance Manual see Table Recommended Maintenance and Monitoring Schedule Start up must be performed Proper start up procedures and scheduled periodic maintenance will prolong...

Page 9: ...NOTES 9...

Page 10: ...10 NOTES...

Page 11: ...NOTES 11...

Page 12: ...intervals are for typical installations Different environmental conditions may dictate more frequent servicing 3 When operating in ambient temperatures below freezing the unit should be inspected mor...

Reviews: