background image

RELEASE DATE

4-10-17

REFERENCE

 

NUMBER

INS-2145-00

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

TENAYA2® SERIES 

Housing Installation

Housing Rough-In

On bottom 

Drill through sides

1.  Connect branch conduit connectors (By Others) 

to the junction box using either the threaded 

conduit entries on the bottom of the junction 

box or through holes drilled into the sides of the 

junction box. 

Do not remove the yellow temporary cover 

during rough-in.

2.  Place housing in hole. Align junction box in the 

path of the conduit trench.

3.  Insert (4) pieces of ½” EMT conduit through the 

Stability Flange™. Hammer into substrate  until 

secure.

Leave sufficient clearance to elevate housing 

to finished grade.

Top of yellow temporary

cover level to

finished grade.

4.  Raise housing on EMT to finished grade (top of 

yellow temp cover). Use bubble level on yellow 

temporary cover to aid in leveling housing. 

5.  When top of yellow temporary cover is level 

with finished grade, tighten screws on Stability 

Flange™ to secure housing to EMT. Remove 

excess EMT as needed.

6.  Connect the conduit to the conduit connectors. 

Soil Prep

A.  Determine Soil Type by referencing DIG-IT 

Guide. Prep soil according to DIG-IT Guide.

 

See www.bklighting.com/dig-it for more 

information.

J-Box

Conduit
Trench

24”

Dia.

B.  Determine Soil Type by referencing DIG-IT 

Guide. 

C.  Dig hole 24” wide and 27-33” deep.

Conduit
Trench

Excavated 
for Housing

D.  Prep soil according to DIG-IT Guide.

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

Summary of Contents for Tenaya 2 Series

Page 1: ...rn off power at fuse or circuit breaker before service The use of accessory equipment not recommended by the manufacturer or installed contrary to instructions may cause an unsafe condition The use of damaged components may cause an unsafe condition and void product warranty IMPORTANT SAFETY INFORMATION READ FOLLOW AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS Do not block light emanating from...

Page 2: ...ve sufficient clearance to elevate housing to finished grade Top of yellow temporary cover level to finished grade 4 Raise housing on EMT to finished grade top of yellow temp cover Use bubble level on yellow temporary cover to aid in leveling housing 5 When top of yellow temporary cover is level with finished grade tighten screws on Stability Flange to secure housing to EMT Remove excess EMT as ne...

Page 3: ...be level with the top of the Yellow Installation Cover Soil installation is NOT Drive over rated Concrete Drive over Soil 7 Per DIG IT Guide backfill the gap between the bottom of housing and bottom of hole with sand for drainage 8 Rotate patented HydroLock plate counter clockwise to allow notch in HydroLock plate to clear pins on junction box Pull to remove 9 Pull branch circuit wiring and extern...

Page 4: ...Concrete Product must be installed by a qualified person in a manner consistent with its intended use and in compliance with the National Electrical Code Canadian Electrical Code and all Local and Provincial Codes Follow product label information and instructions Qualified Personnel with appropriate personal protective equipment must perform all servicing of this product Before wiring to power sup...

Page 5: ...he optical chamber horizontally 360 rotate the optical chamber to desired direction 8 For Optional Internal Cutoff Place internal cutoff louver in the top of the optical chamber in the desired direction of cutoff and install faceplate as normal Optional Internal Cutoff 7 Before Installation of faceplate clean solid silicone faceplate gasket see arrows and collar of debris for a proper seal FAILURE...

Page 6: ...n to 25 in lbs 5 Remove optic holder by loosening two 2 4 40 screws using a 0 05 Allen wrench 6 Carefully remove LED module from heatsink Do not pull on connector or wiring Handle with care Fragile Do not pull on connector or wiring Handle with care 7 Use small pick tool to push connector off LED board through two small slots behind connector Once loose lift connector upwards and off board 8 Place...

Page 7: ...Tighten 2 6 32 set screws to secure accessory bracket to OptiLock as shown 15 Before Installation of faceplate clean solid silicone faceplate gasket see arrows and collar of debris for a proper seal FAILURE TO DO THIS STEP WILL CAUSE FIXTURE TO FAIL AND VOID PRODUCT WARRANTY 13 If your Tenaya2 comes with optional accessory holder see Relamping with Accessory Holder to remove and install source To ...

Page 8: ...RUCTIONS 3 Insert up to 2 accessories into the accessory holder Accessories should rest on lip of accessory holder NOTE 1 Insert any accessory lens with the smooth side toward the LED 2 If using a honeycomb baffle position it farthest from the LED Accessory Replacement 4 Place accessory holder onto tabs on accessory bracket over optic 1 Pull accessory holder from accessory bracket 2 Optic should r...

Page 9: ...ighten two set screws 2 Install the faceplate using 3 16 Allen wrench and torque the faceplate screws in a cross pattern to 25 in lbs Rock Guard w Optical Opening Rock Guard Half Dome Glare Shield 1 Before installation of faceplate clean solid silicone faceplate gasket see arrows and collar of debris for a proper seal FAILURE TO DO THIS STEP WILL CAUSE FIXTURE TO FAIL AND VOID PRODUCT WARRANTY Fac...

Reviews: