IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
RELEASE DATE
06/10/2023
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
REFERENCE NUMBER
INS-2406-00
Standard Installation
CO2
INTEGRAL - LED
Conduit
trench
18”
Dia.
1. Determine Soil Type by referencing DIG-IT Guide.
2. Dig hole 18” wide and 18” deep.
Conduit
Trench
Excavated
for Housing
3. Prep soil according to DIG-IT Guide.
Soil Prep
Housing Installation
2. Place housing in hole. Align junction box in the path
of the conduit trench.
3. Insert four (4) pieces of ½” PVC/EMT conduit
through the Stability Flange. Hammer into substrate
until secure.
Leave sufficient clearance to elevate housing to
finished grade.
4. Raise housing on PVC/EMT so housing is flush
with finished grade. Use a level to aid in housing
installation.
5. When housing is level, tighten screws on Stability
Flange to secure housing to PVC/EMT. Remove
excess PVC/EMT as needed.
Flush with finished grade
6. Pull primary branch circuit wiring into junction
box.
1. Connect branch conduit connectors (not included)
to the junction box using either the threaded
conduit entries on the bottom of the junction box or
through holes drilled into the sides of the junction
box.
Recommend 7/8” hole saw to open threaded entry
hole.
SCAN WITH SMART DEVICE OR CLICK THE BAR
CODE FOR ONLINE DIG-IT GUIDE
Threaded Entry
Side Flats