background image

Surge Protection

This product features built-in surge protection circuitry in compliance with 

applicable standards.

For comprehensive protection of a luminaire installation against lightning and  

electrical surges, it is essential to cover mains supply and data input lines at  

the distribution board level, by using respective primary (Type 1) and secondary  

(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.

Warning

Ensure that all required surge protection measures are in place and activated  

prior to luminaire installation. Also, disconnect luminaires before operating 

high-power devices such as, for example, electrical arc welders.

Do not open during installation

This product is factory-sealed. 

Refer to the instructions contained in this 

document for details.

WE-EF LEUCHTEN

Installation and Maintenance

Instructions 

Bollards and Pathway Luminaires 

MRY224

Installation tools

Mounting hardware used on this product 

includes fasteners with hexalobular socket 

heads (ISO 10664). Installation requires the use 

of matching tools.

Summary of Contents for MRY224

Page 1: ...1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires before operating high power devices such as for examp...

Page 2: ...C for 15 W with 1 10 V dimming for other Ta 40 C Tool required Torx T25 provided by WE EF Weight H kg for MRY224 600 8 0 for MRY224 850 10 8 for MRY224 1000 12 4 Accessories Planted root Galvanised s...

Page 3: ...ecial maintenance work is required Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOL HG D...

Page 4: ...KH OXPLQDLUH LV PRGL HG E DQ ERG RWKHU than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility of the modifying person organisation Claims ba...

Page 5: ...e Ensure orientation of post C allows easy access to terminal block G DQG VFUHZ DQJH SODWH E with M10 bolts nuts to ground An optional planted root is available Note Planted root installation instruct...

Page 6: ...rol line D D 1 10 V control line For operation with Tunable White a DALI DT8 controller is required 7 Place sleeve B including luminaire head over post C while keeping screw A in line with terminal bo...

Page 7: ...6 8 Align sleeve B DQG DQJH SODWH E 9 Tighten screw A with Torx T25 tool provided by WE EF A E B...

Page 8: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Reviews: