IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
RELEASE DATE
06/10/2023
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
REFERENCE NUMBER
INS-2406-00
Standard Installation
CO2
INTEGRAL - LED
7. Per DIG-IT Guide, backfill hole based off of
determined soil type.
8.
For soil installation:
Fill and tamp soil to the
appropriate height leaving room for sod, pavers,
etc. to be level with the top of the temporary cover.
Soil installation is not drive-over rated.
OPTIONAL GROUT MASK INSTALLATION
(IF ORDERED)
7. Fill partway, then place grout mask around housing,
centered at faceplate. Insert stakes through stability
flange. Top of grout mask should be flush with
grade.
9.
For concrete installation:
Fill the hole around the
fixture housing to 12” below the finished grade with
clean fill dirt and tamp carefully to prevent settling
of fixture. Pour concrete and finish as required flush
with the top surface of the temporary cover.
OPTIONAL GROUT MASK INSTALLATION
(IF ORDERED)
8.
For soil installation:
Fill and tamp soil to the
appropriate height leaving room for sod, pavers,
etc. to be level with the top of the temporary cover.
Soil installation is not drive-over rated.
OPTIONAL GROUT MASK INSTALLATION
(IF ORDERED)
9.
For concrete installation:
Fill the hole around the
fixture housing to 12” below the finished grade with
clean fill dirt and tamp carefully to prevent settling
of fixture. Pour concrete and finish as required flush
with the top surface of the grout mask.