Standard Installation

 CO2

INTEGRAL - LED

7.  Per DIG-IT Guide, backfill hole based off of 

determined soil type.

8.  

For soil installation: 

Fill and tamp soil to the 

appropriate height leaving room for sod, pavers,  

etc. to be level with the top of the temporary cover.

 Soil installation is not drive-over rated. 

OPTIONAL GROUT MASK INSTALLATION 

(IF ORDERED)

7.  Fill partway, then place grout mask around housing, 

centered at faceplate. Insert stakes through stability 

flange. Top of grout mask should be flush with 

grade.

9.  

For concrete installation: 

Fill the hole around the 

fixture housing to 12” below the finished grade with 

clean fill dirt and tamp carefully to prevent settling 

of fixture. Pour concrete and finish as required flush 

with the top surface of the temporary cover.

OPTIONAL GROUT MASK INSTALLATION 

(IF ORDERED)

8.  

For soil installation: 

Fill and tamp soil to the 

appropriate height leaving room for sod, pavers, 

etc. to be level with the top of the temporary cover.

 Soil installation is not drive-over rated. 

OPTIONAL GROUT MASK INSTALLATION 

(IF ORDERED)

9.  

For concrete installation: 

Fill the hole around the 

fixture housing to 12” below the finished grade with 

clean fill dirt and tamp carefully to prevent settling 

of fixture. Pour concrete and finish as required flush 

with the top surface of the grout mask.

Summary of Contents for CO2

Page 1: ...ing to power supply and during servicing turn off and lock out power at fuse or circuit breaker before service The use of accessory equipment not recommended by the manufacturer or installed contrary...

Page 2: ...our 4 pieces of PVC EMT conduit through the Stability Flange Hammer into substrate until secure Leave sufficient clearance to elevate housing to finished grade 4 Raise housing on PVC EMT so housing is...

Page 3: ...at faceplate Insert stakes through stability flange Top of grout mask should be flush with grade 9 For concrete installation Fill the hole around the fixture housing to 12 below the finished grade wi...

Page 4: ...al or water may intrude This step must be done as stated or you will void your warranty HydroLock Plate HOT BLACK NEUTRAL WHITE GROUND GREEN 0 10V VIOLET 0 10V GRAY WIRING DIAGRAM 0 10V Dimming All li...

Page 5: ...8 allen wrench and hand tighten the faceplate screws in a star pattern to 30 in lbs min Do not use a power tool to install screws Do not exceed 40 in lbs 9 To aim OptiLock vertically loosen two 2 1 4...

Page 6: ...f applicable 2 Turn then lift OptiLock from housing Disconnect OptiLock assembly from driver assembly using quick disconnect 9 Attach OptiLock assembly to installed driver assembly with quick disconne...

Page 7: ...o ring groove near top of housing Place o ring inside of groove Failure to clean groove of debris will cause fixture to fail and void product warranty 11 To aim OptiLock horizontally lift OptiLock fr...

Page 8: ...with quick disconnect Place OptiLock assembly in housing resting the OptiLock on the pins provided inside the housing Gravity will hold OptiLock in place 4 Use a 0 050 allen wrench to loosen three 3...

Reviews: