Geno Range RO/DI Water System, Series 5 Operation Manual
Avidity Science, LLC
12
Routine Maintenance
5.
On ,
touch
•
The permeate valve closes, the flush valve opens, and the system depressurizes for 30 seconds
as shown below.
6.
When the pressure screen shown below appears, observe the pressure gauge to verify the system
has depressurized.
NOTE:
The system does not measure the pressure, so it is essential that the user verify that there is
zero pressure before continuing.
7.
When the system has been confirmed to be depressurized, touch
. The flush valve closes.
DOMINIQUE
DUTSCHER
SAS