Geno Range RO/DI Water System, Series 5 Operation Manual
Avidity Science, LLC
16
Routine Maintenance
5.
On ,
touch
.
•
permeate valve closes, the flush valve and the DI valve open, and the system depressurizes for
30 seconds as shown below.
6.
When the pressure screen shown below appears, observe the pressure gauge to verify the system
has depressurized.
NOTE:
The system does not measure the pressure, so it is essential that the user verify that there is
zero pressure before continuing.
7.
When the system has been confirmed to be depressurized, touch
. The flush valve closes.
8.
When
, remove the existing TC002 cartridge.
9.
Place the cartridge is a safe location for disposal later.
10.
Remove the packaging from the applicable
Endure Purification Pack
.
DOMINIQUE
DUTSCHER
SAS