Geno Range RO/DI Water System, Series 5 Operation Manual
Avidity Science, LLC
24
Routine Maintenance
15.
On ,
touch
.
•
The RO Clean and flush operation starts and a 900 second (15 minute) countdown begins.
•
The flush valve opens and the system depressurizes for 30 seconds as shown below
16.
When the pressure screen shown below appears, observe the pressure gauge to verify the system
has depressurized.
NOTE:
The system does not measure the pressure, so it is essential that the user verify that there is
zero pressure before continuing.
17.
When the system has been confirmed to be depressurized, touch
. The flush valve closes.
18.
When
appears, disconnect the strainer from the pretreatment module connections.
DOMINIQUE
DUTSCHER
SAS