Step 1c (Stacked Switches)(10 Gb Module):
•
Place the Engine and Switch in their physical locations. (E.g. Rack mount.)
•
Connect power cables, keyboard, monitor, and mouse.
•
Insert Transceivers and connect network cables using the diagram below.
•
Continue with Step 2 (page 5).
Rear view of the ISIS Engine
P28
27
XFP26
AC
XFP25
DC
Alarm
STACK ID
S25-01-GE-24V
To Ethernet Clients
Rear view of two stacked Force10 S25 switches.
To Optical Clients
(SFP required)
P28
27
XFP26
AC
XFP25
DC
Alarm
STACK ID
S25-01-GE-24V
Front view of two Force10
S25 stacked switches.
(See the ISIS 5000 Setup Guide for proper
installation of 10 Gb and stacking modules.)
To 2nd Engine (optional)
4
To 3rd Engine (optional)
To 4th Engine (optional)
To 1st Engine, or System Director
Hardware Setup