89
10.8.2. Virus Database Update Schedule
On the Schedule settings tab you can first check/uncheck the Enable this task
item to simply deactivate the scheduled virus database update temporarily, and
switch it on again as the need arises.
The basic virus database update scheduling is covered within the
Update Manager
component. Within this dialog you can set up some detailed parameters of the virus
database update schedule:
Give a name to the virus database update schedule you are about to create. Type the
name into the text field by the Name item. Try to use brief, descriptive and
appropriate names of update schedules to make it easier to recognize the schedule
among others later.
Schedule running - specify the time intervals for the newly scheduled virus
database update launch. The timing can either be defined by the repeated