
Updating Hardware
46 Installing the S6200, S6500, and S6800 Conferencing Server
4. Ethernet RJ-45 connector
5. Four T1/E1 RJ-48c trunk connectors
6. E1/T1/J1 LEDs
7. PCI adaptor
Installing the TP-260
!
CAUTION:
CAUTION:
Installation of Gateway Board should be performed by Authorized, qualified
Person.
VOLTAGE ALERT:
VOLTAGE ALERT:
Prior to installation of Audio codes board in a chassis, always correctly connect
the chassis to a safety ground according to the laws and regulations of the
country in which the installation is performed
ELECTROSTATIC ALERT:
ELECTROSTATIC ALERT:
Electronic Components on the PCB are extremely sensitive to static electricity, to
reduce the risk of damage due to ESD when installing or servicing electronic
equipment, it is recommended that anti-static grounding straps and mats to be
used.
Unpacking the board
The TP260 Gateway board is shipped in a box, along with the following items:
●
TP260 board sealed in Antistatic bag - Qty 1
●
Trunk Splitter Cables
- Qty 4
●
CD - Documentation
- Qty 1
●
Hardcopy documents
- Qty 1
Follow this procedure to unpack the board components:
1. Remove each item from the box and examine for any obvious physical damages. If you
notice any damages, log your observations, and immediately report the problem to
management so that proper action may taken.
!
Important:
Important:
If you see any physical damage on the board or packing, return board to factory
for replacement, with remarks.