
Installation Manual
Page 57
IP Office 2.1
40DHB0002USCL Issue 10c (11th May 2004)
Basic System Programming
Introduction
This sections covers only the most basic aspects of system programming required to install an IP Office
system. When first powered up, all IP Office systems will operate as a simple PBX. However, full system
programming is highly dependent on customer requirements. Hence, some basic Initial Programming
must be performed before detailed configuration programming is possible. The Administration CD
(supplied with each system) contains the suite of programs required to install and maintain the IP Office
system. Once loaded, inter-active
Help
files provide all the instructions and details required to operate
and administer the program suite.
Notes:
1. When applying power to the IP Office system, the Expansion Modules
must be
switched on
first.
If the main IP Office Module does not detect an item at power on it will never use it. If power is
switched on from a central point for all modules, then, as the main unit is the slowest to start, this
will be taken care of automatically.
2. When powered up correctly, all modules will display a steady green light in the center of each
module. When connection is established with ports, the port socket on the appropriate module
will show a green LED, e.g. the hub port connected to your PC for programming. IP Office
systems are ready for use within 1 minute of power on.