![Avaya G600 Installing Manual Download Page 245](http://html1.mh-extra.com/html/avaya/g600/g600_installing-manual_3027010245.webp)
245
Migrating to an Avaya™ S8700 Media Server with Avaya™ MCC1 or SCC1 Media Gateway
Testing the Complete Configuration
May 2003
Testing telephones and other equipment
This section describes how to test the telephones and other equipment. Perform these tests after
the equipment has been wired to the media gateway and after the customer’s data for that
equipment has been administered. The tests are acceptance tests and provide some assurance
that the S8700 IP Connect or Multi-Connect configuration will perform properly after
installation and administration.
If problems occur or more extensive tests are required, refer to the maintenance book for your
configuration
.
Task List: Perform Acceptance Tests
1
2
3
4
5
"Test queue warning indicator"
6
"Test integrated announcement"
7
8
"Test emergency transfer (S8700 Multi-Connect only)"
9
"Test remote access interface"
10
"Test terminating trunk transmission"
11
"Test connectivity to the LAN"
12
"Test Stratum 3 Clock (if used—S8700 Multi-Connect only)"
13
Make test calls
Make 2 calls from 1 telephone to another telephone. Make the first call by dialing a telephone
and make the second call by dialing a trunk access code and a Listed Directory Number (LDN).
Test 302C Attendant console
Check all lamps are operational and call another telephone in the configuration.
1
Simultaneously press and hold the Ringer Volume up button and the POS BUSY button.
This puts the console in the self-test mode.
NOTE:
Releasing the buttons returns the console to normal mode.