BCM450 Hardware & Installation
NN40011-001 Issue 1.2 BCM450 Rls 6.0
95
4. Click
Open
.
5. The new keycode file will be applied to the BCM, allowing the software
upgrade to be performed.
Performing the Upgrade
You may receive your upgrade files on DVD or in zip format. If your files are in
zip format, ensure they are extracted to an accessible location before
proceeding with the upgrade.
Note:
If the keycode containing the relevant upgrade entitlement has not been
applied to the BCM, you will not be able to perform the upgrade.
Note:
The upgrade process can take up to 30 minutes, during which some or
all of the BCM services will be unavailable.
Note:
Do not interrupt or power down the BCM during the upgrade process,
as this could cause catastrophic failure to the BCM.
Use the following procedure to apply the upgrade files to the BCM.
1. In the Element Manager
Administration
tab, open the
Software
Management
folder and select
Software Updates
.