3600 Series IP Phone Installation
Page 53
IP Office 4.0
15-601082 Issue 05a (22nd May 2007)
4. Certifying the Installation
4.1 Site Certification
The installer should not leave the site before performing installation verification.
These tests must be performed in typical operating conditions, especially if heavy loads occur. Testing
sequence and procedure is different for every installation. Generally, you should organize the test
according to area and volume, placing numerous calls to others who can listen while you perform
coverage tests. Note any areas with excessive static or clarity problems and report it to an Avaya
engineer.
The coverage test will also require you to put the wireless phone in
Site Survey
mode and walk the
entire coverage area to verify all access points.
1.
Important
The installation is not complete until these certification steps have been performed. Do
NOT
hand
out wireless phones at a site that has not been certified.