20
9. Check for proper height. Lift must be solid and flush with pit curb angle framing (D). If needed, shim to
desired height. DO NOT “spot” shim. Shim along full length of frame. This will prevent frame from
sagging under load.
10. Remove the shipping bolt and eye bolts from the lift and hydraulically raise the platform.
Failing to remove the shipping bolts before operation will cause
permanent damage to the lift.
11. Fill hydraulic reservoir with proper type and volume of fluid.
12.
Press “UP button and raise lift one foot.
13. Press
“DOWN” button to fully lower lift. Continue to hold down button for
60 seconds. Repeat procedure five to seven times to bleed air out of
hydraulic system.
14. Raise and lower lift as needed to make positioning adjustments.
15. Adjust platform to a clearance of 1
” minimum around perimeter between
platform and pit angle.
NEVER go under a raised lift platform until load is removed and
lift is securely blocked in raised position with maintenance
devices.
See "Maintenance Device" section of this manual.
Lock-out/tag-out power source.
16. Base frame of lift has pre-drilled holes for anchoring to the floor. Anchor lift to floor. Lifts with oversize
platforms have minimum pull out requirements of 2,000 lbs. for each anchor.
See “Shimming And
Anchoring Lif
t To Concrete”.
17.
18. Make permanent electrical and hydraulic connections and operate lift through a few cycles.
19. Clean up debris and spilled oil from area. Dispose of oil in an environmentally safe manner.
20. Touch-up paint is available from
Autoquip
for repair of damaged paint surfaces.
21. Train personnel on lift operation, all safety features and procedures.
i
CAUTION
i
WARNING
Summary of Contents for PLTC-58120
Page 13: ...13 1 DECAL_CAPACITY 2 36430050 3 36401487 4 36401560 5 06100010...
Page 14: ...14 6 36403225 7 36400265 8 36400257 9 36403720 10 36433670...
Page 17: ...17 PLT Pit Detail See Pit Installation Notes...
Page 19: ...19 Lifting and Installation...
Page 22: ...22 4 6 Bridge Lifting Chain Installation Steel Bridge...
Page 23: ...23 4 7 Bridge Lifting Chain Installation Aluminum Bridge...
Page 24: ...24 4 8 Bridge Winch Installation Steel Bridge...
Page 25: ...25 4 9 Bridge Winch Installation Aluminum Bridge...
Page 26: ...26 4 10 Pit Modification Installation for Mechanical Wheel Chock...
Page 30: ...30 Figure 6 1...
Page 35: ...35 Figure 6 3 Cylinder Seals...
Page 39: ...39 Electric Schematic 5HP 3Ph Continuous Running Vertical Power Unit...
Page 40: ...40 Electric Schematic 5HP 1Ph 230V Vertical Power Unit...
Page 41: ...41 Electric Schematic 3HP 1Ph 115V Vertical Power Unit...
Page 42: ...42 Hydraulic Schematic Contractor Power Unit...
Page 43: ...43 Hydraulic Schematic Vertical Power Unit...
Page 44: ...44 Hydraulic Schematic Continuous Running Vertical Power Unit...
Page 45: ...45 Push Button Wiring Diagram...
Page 46: ...46 Guarded Foot Switch Wiring Diagram...
Page 47: ...47 Guarded Foot Switch Assembly...
Page 48: ...48 Optional Limit Switch Mounting Diagram PLTC 6050 to 6060...
Page 49: ...49 Optional Limit Switch Mounting Diagram PLTC 6070 to 58150...
Page 54: ...54 7 PARTS LISTS Contractor Power Unit...
Page 55: ...55 Vertical Power Unit...