36
7. Install new piston, seals, and rod wiper.
8. Install and tighten piston head nut to 325
ft•lb of torque. Upper clevis and pin may be used to prevent
rotation of rod while tightening.
9. Liberally lubricate piston and seal with clean grease or oil.
10. Insert piston into barrel, taking care not to damage seal.
11. Slip bearing assembly into place and align retainer hole with slot in barrel.
12. Turn bearing with spanner wrench until retainer is reinserted completely.
6.3.1.3.
Placing Cylinder Back Into Service
Loctite PST #567 pipe thread sealant or equivalent is recommended.
Do not use Teflon tape on hydraulic threaded connections.
Tape fragments may damage hydraulic system.
Autoquip recommends replacing any NPT fittings that have been disassembled due to their inherent
design for sealing.
1. Check that lift anchors are tight (when used). Check all pins and other mechanical and hydraulic
connections.
2. Restore oil level. See oil recommendations in
“Oil Requirements” section.
3. Turn on electrical power and pre
ss “UP” button. Loosen bleeder plug at the top end of ram casing and
operate pump to remove trapped air from ram. When clear oil appears, tighten plug and raise lift
slightly to disengage maintenance locks.
4. Lower lift completely and hold
“DOWN” button for 60 seconds to allow air in cylinders to bleed back
into reservoir.
5.
See “Bleeding Air From System” section
6.3.2
Bleeding Air From System
1. Bleed air from system by raising lift 25-50% of full travel, then lower
completely.
2.
Hold “DOWN” button for 60 seconds.
3. Repeat procedure 8-10 times. If this does not bleed all air from system,
contact Autoquip.
4. Clean up any spilled oil. Dispose of spilled oil in an environmentally safe
manner.
6.3.3
Hydraulic Velocity Fuse and Flow Control (VF/FC) Replacement
NOTICE
Summary of Contents for PLTC-58120
Page 13: ...13 1 DECAL_CAPACITY 2 36430050 3 36401487 4 36401560 5 06100010...
Page 14: ...14 6 36403225 7 36400265 8 36400257 9 36403720 10 36433670...
Page 17: ...17 PLT Pit Detail See Pit Installation Notes...
Page 19: ...19 Lifting and Installation...
Page 22: ...22 4 6 Bridge Lifting Chain Installation Steel Bridge...
Page 23: ...23 4 7 Bridge Lifting Chain Installation Aluminum Bridge...
Page 24: ...24 4 8 Bridge Winch Installation Steel Bridge...
Page 25: ...25 4 9 Bridge Winch Installation Aluminum Bridge...
Page 26: ...26 4 10 Pit Modification Installation for Mechanical Wheel Chock...
Page 30: ...30 Figure 6 1...
Page 35: ...35 Figure 6 3 Cylinder Seals...
Page 39: ...39 Electric Schematic 5HP 3Ph Continuous Running Vertical Power Unit...
Page 40: ...40 Electric Schematic 5HP 1Ph 230V Vertical Power Unit...
Page 41: ...41 Electric Schematic 3HP 1Ph 115V Vertical Power Unit...
Page 42: ...42 Hydraulic Schematic Contractor Power Unit...
Page 43: ...43 Hydraulic Schematic Vertical Power Unit...
Page 44: ...44 Hydraulic Schematic Continuous Running Vertical Power Unit...
Page 45: ...45 Push Button Wiring Diagram...
Page 46: ...46 Guarded Foot Switch Wiring Diagram...
Page 47: ...47 Guarded Foot Switch Assembly...
Page 48: ...48 Optional Limit Switch Mounting Diagram PLTC 6050 to 6060...
Page 49: ...49 Optional Limit Switch Mounting Diagram PLTC 6070 to 58150...
Page 54: ...54 7 PARTS LISTS Contractor Power Unit...
Page 55: ...55 Vertical Power Unit...