2
1.
Introduction And Warranty ............................................................................................................ 4
1.1
Introduction ................................................................................................................................. 4
1.1.1
Identification .......................................................................................................................... 4
1.1.2
Inspection .............................................................................................................................. 4
1.1.3
Planned Maintenance Program ............................................................................................. 4
1.2
Responsibility Of Owners/Users .................................................................................................. 4
1.2.1
Deflection .............................................................................................................................. 4
1.2.2
Inspection & Maintenance ..................................................................................................... 5
1.2.3
Removal From Service .......................................................................................................... 5
1.2.4
Repairs ................................................................................................................................. 5
1.2.5
Operators .............................................................................................................................. 5
1.2.6
Before Operation ................................................................................................................... 5
1.2.7
During Operation ................................................................................................................... 5
1.2.8
Modifications Or Alterations................................................................................................... 5
1.3
Warranty ..................................................................................................................................... 6
2.
Specifications ................................................................................................................................. 7
2.1
Model Specifications ................................................................................................................... 7
2.2
Lift Specifications ........................................................................................................................ 8
2.3
Load Capacity ............................................................................................................................. 8
2.4
Unbalanced Loading ................................................................................................................... 8
2.5
Pump Pressure ........................................................................................................................... 8
2.6
Lift Duty ...................................................................................................................................... 8
3.
Safety .............................................................................................................................................. 9
3.1
Safety Signal Words ................................................................................................................... 9
3.2
Installation ................................................................................................................................... 9
3.3
Operation .................................................................................................................................... 9
3.4
Hydraulics ................................................................................................................................. 10
3.5
Maintenance ............................................................................................................................. 11
3.6
Modifications ............................................................................................................................. 11
3.7
Labels ....................................................................................................................................... 12
4.
Installation .................................................................................................................................... 15
4.1
Remote Power Unit Installation ................................................................................................. 15
4.2
Power Unit Wiring ..................................................................................................................... 15
4.2.1
Contractor Remote Power Unit ............................................................................................ 15
4.2.2
Heavy Duty Remote Power Unit .......................................................................................... 15
4.3
Pit Installation ........................................................................................................................... 16
4.4
Surface Installation ................................................................................................................... 21
4.5
Shimming And Anchoring Lift To Concrete ................................................................................ 21
4.6
Bridge Lifting Chain Installation
– Steel Bridge .......................................................................... 22
4.7
Bridge Lifting Chain Installation
– Aluminum Bridge .................................................................. 23
4.8
Bridge Winch Installation
– Steel Bridge ................................................................................... 24
4.9
Bridge Winch Installation
– Aluminum Bridge ............................................................................ 25
4.10
Pit Modification & Installation for Mechanical Wheel Chock ...................................................... 26
4.11
Accordion Skirt Installation ........................................................................................................ 27
5.
Operation ...................................................................................................................................... 28
5.1
Raise And Lower Lift ................................................................................................................. 28
5.2
Raise And Lower Bridge (hydraulic) .......................................................................................... 28
6.
Maintenance ................................................................................................................................. 29
6.1
Maintenance Device ................................................................................................................. 29
6.2
Routine Maintenance ................................................................................................................ 31
6.2.1
Every Day Or 10 Hours Of Operation .................................................................................. 32
6.2.2
Every Month Or 100 Hours Of Operation............................................................................. 32
6.2.3
Every Year Or 1000 Hours Of Operation ............................................................................. 32
6.2.4
Oil Requirements ................................................................................................................ 33
6.2.5
Oil Capacity ......................................................................................................................... 33
Summary of Contents for PLTC-58120
Page 13: ...13 1 DECAL_CAPACITY 2 36430050 3 36401487 4 36401560 5 06100010...
Page 14: ...14 6 36403225 7 36400265 8 36400257 9 36403720 10 36433670...
Page 17: ...17 PLT Pit Detail See Pit Installation Notes...
Page 19: ...19 Lifting and Installation...
Page 22: ...22 4 6 Bridge Lifting Chain Installation Steel Bridge...
Page 23: ...23 4 7 Bridge Lifting Chain Installation Aluminum Bridge...
Page 24: ...24 4 8 Bridge Winch Installation Steel Bridge...
Page 25: ...25 4 9 Bridge Winch Installation Aluminum Bridge...
Page 26: ...26 4 10 Pit Modification Installation for Mechanical Wheel Chock...
Page 30: ...30 Figure 6 1...
Page 35: ...35 Figure 6 3 Cylinder Seals...
Page 39: ...39 Electric Schematic 5HP 3Ph Continuous Running Vertical Power Unit...
Page 40: ...40 Electric Schematic 5HP 1Ph 230V Vertical Power Unit...
Page 41: ...41 Electric Schematic 3HP 1Ph 115V Vertical Power Unit...
Page 42: ...42 Hydraulic Schematic Contractor Power Unit...
Page 43: ...43 Hydraulic Schematic Vertical Power Unit...
Page 44: ...44 Hydraulic Schematic Continuous Running Vertical Power Unit...
Page 45: ...45 Push Button Wiring Diagram...
Page 46: ...46 Guarded Foot Switch Wiring Diagram...
Page 47: ...47 Guarded Foot Switch Assembly...
Page 48: ...48 Optional Limit Switch Mounting Diagram PLTC 6050 to 6060...
Page 49: ...49 Optional Limit Switch Mounting Diagram PLTC 6070 to 58150...
Page 54: ...54 7 PARTS LISTS Contractor Power Unit...
Page 55: ...55 Vertical Power Unit...