36
Dual Gate Controller DCB-05
Owner Installation Instructions
V+
IN
V-
AUX
OPEN
STOP
CLOSE
OSC
SWIPE
PEDESTRIAN
COMMON
OUT2 +
OUT2 -
OUT1 N/C
OUT1 COMMON
OUT1 N/O
P.E BEAM
Wiring Control Inputs
The console switch inputs may be used for operating
the gate via any device that provides and switch contact
output.
AUX, OPN, STP, CLS, SWP, PED requires normally open
contact switches. OPN and STP inputs can be confi gured
to take normally close contact switches.
Battery Backup installation
Connect the Battery Backup Kit
Disconnect power to the gate controller.
Secure the SBY-3 Charger Board in the
controller box with sticky pads (supplied
with the battery charger kit part number #
90188).
Connect the SBY-3 charger board to battery
box and to Dual Gate Controller as shown
(Fig 51).
Reconnect power.
From menu 7.7 select the “battery enabled
option”
Testing Battery Backup
Press transmitter to test the gate opener.
Whilst gate is in motion, disconnect mains
power. The gate should continue to operate
as normal.
NOTE:
Wait for the gate to complete its travel.
Press the transmitter to activate the gate.
Whilst gate is in motion re-connect power. The
gate should complete the cycle as normal.
Troubleshooting
If gate stops or moves very slowly under battery
power, the batteries may be weak or have no
charge. Connect mains power and allow the
batteries to charge. This may take 24 - 48 hours to
reach maximum charge capacity.
1.
2.
3.
4.
5.
1.
2.
3.
4.
70
fi g
71
fi g