21
Fig. 26. Endoscope heating
Main switch
Sleeves of the endoscope heater
Fig. 25. Mirror preheater
Headlamp suspension
Mirror rack
Fig. 27. Tongue patches and swab dispenser
Fig. 28. Standard rail
4.0 Operation
4.3.6 Mirror preheater (option)
• Mirror preheater is switched on when the main switch (
1
,
fig. 1, page 8) is activated.
ª
The rack (
2
, fig. 25) containing the mirrors is heated
up to about 45 °C.
)
ENT unit should be switched on about 20 minutes before
starting work, to ensure preheating in good time!
)
Attention, high temperatures!
)
Prior to use of the mirror, always check its temperature
(e.g. with the back of the hand)!
4.3.7 Headlamp suspension (option)
• For storing the headlamp (
1
, fig 25).
4.3.8 Endoscope heating (option)
• Endoscope heating is switched on when the main switch
(
1
, fig. 26) is activated.
ª
Endoscopes are warmed to approx. 40 °C.
)
ENT unit should be switched on about 20 minutes before
starting work, to ensure preheating in good time!
)
The metal quivers of the endoscope holder are to be
used solely for holding the endoscopes, these
first
having been cleaned and disinfected.
)
The metal quivers must regularly be removed and
cleaned.
Do not fill in any liquids.
4.3.9 Tongue patches and swab dispenser
(option)
• The tongue patches and swab dispenser hygienically
stores tongue patches and swabs.
• The whole dispenser may be pulled out at the front for
filling or refilling (fig. 27).
4.3.10 Waste bin (option)
• The door of the waste bin (
11
, fig. 1, page 8) is fitted with
a "kick box" locking device. The waste bin automatically
opens a little by lightly touching the door with the hand or
foot.
• The kick box locks automatically on closing.
4.3.11 Holder for standard rail (option)
• Purpose: For adding disposable secretion canister
systems.
• The standard rail holder (
1
, fig. 28) may be used for one
2 or 3 l canister.
• Maximum load: 5 kg.
1
2
1
1
2
2
1
2
1