Installation
28
PVL12
• If latches click out of synchronization, tighten the cable on the one that
clicks fi rst;
• Fill the more fl uid if necessary till the tank is full.
7.16 Installation
Of
Arms
• Raise the carriages to a convenient height;
• Install the swing arms on the carriages
using the included pins as shown;
• Check for proper engagement of the arm
lock – the teeth on the lock should fully
engage the gear on the arm. If arm pins
are not fi tting, pull up on arm lock to allow
slack for the arm to move around in the
carriage, allowing the arm pin to fi t easier.
7.17 Check Before Start-Up
7.17.1 General Checks
• Make sure that the columns are plumb;
• Make sure the lift anchored to the ground and all anchor bolts tightened.
• Make sure the electrical system feeding voltage is equal to that specifi ed in
the nameplate on the motor;
• Make sure the electric system connection in conformity of the electric plan
shown as the electric diagram (fi g. 6) and for proper grounding.
• Particularly, below checks must be followed:
7.17.2 Mechanical Safeties For Proper Installation
• Check to make sure that safety latches will properly engage and disengage
by manual release;
• If latches click out of synchronization, tighten the cable on the one that
clicks fi rst.
Summary of Contents for PVL12
Page 1: ...Replace This With Cover PDF...
Page 13: ...Technical Specification 13 PVL12 Figure 3 Layout...
Page 16: ...Technical Specification 16 PVL12 Figure 6 Electrical Diagram 220V 50Hz 60Hz 1Ph...
Page 19: ...Safety 19 PVL12 Figure 7 Safety Signs...