Installation
23
PVL12
• Install the anti-crushing bar brackets on the beam using M6X16 screws
and nuts. Make sure to position the overhead switch bracket adjacent the
power-side column;
• Place the anti-crushing bar on the overhead switch bracket and fi x it on
another bracket using M8X40 screw and nuts;
• Slide the overhead switch into the anti-crushing bar and fi x it using M8X55
screws and nuts. Make sure the switch cable goes through hose guides /
retainers on the columns;
• Use a lifting device to raise the assembled beam and install it to the
column extensions as shown. The beam has the hook on each end to aid
the installation;
• Tighten all screws and nuts for connection of the beams properly.
Figure 10 – Installation Of Overhead Beam
7.9
Installation Lock Latch And Cam Plate On Column
• Determine the proper installation position of the lock latch and cam plate
on power-side column and off-side column;
• Align the Latch shaft, spacer, return spring,
lock latch and cam plate as fi g. 11 shown,
install them on power-side and off-side;
• Tighten Screw M10X16 on each side.
• After installation, have a check make sure
it is well to use.
Summary of Contents for PVL12
Page 1: ...Replace This With Cover PDF...
Page 13: ...Technical Specification 13 PVL12 Figure 3 Layout...
Page 16: ...Technical Specification 16 PVL12 Figure 6 Electrical Diagram 220V 50Hz 60Hz 1Ph...
Page 19: ...Safety 19 PVL12 Figure 7 Safety Signs...