Vent plug, oil cooler
Step
Description
-
Run the compressor until warm. Stop the compressor after 3 minutes of unloaded operation.
Close the air outlet valve and switch off the voltage. Wait a few minutes and depressurise by
unscrewing oil filler plug (FC) just one turn to permit any pressure in the system to escape.
-
Air cooled units: loosen the vent plug (VP) of the oil cooler and wait for 5 minutes.
-
Remove drain plug (DP1) and open drain valve (Dm).
Also drain the oil by removing the drain plug:
• on the check valve (DP2)
• on the gear casing (DP3)
-
Collect the oil in a collector and deliver it to the local collection service. Refit and tighten the drain
and vent plugs after draining.
Close the drain valve (Dm).
-
Remove the oil filter (OF).
Be aware that this filter has a left thread connection.
Clean the seat
on the manifold. Oil the gasket of the new filter and screw it into place. Tighten firmly by hand.
-
Remove filler plug (FC).
Fill the air receiver (AR) with oil until the level reaches the filler neck.
Take care that no dirt drops into the system. Refit and tighten filler plug (FC).
-
Run the compressor loaded for a few minutes. Stop the compressor and wait a few minutes to
allow the oil to settle.
-
Depressurise the system by unscrewing filler plug (FC) just one turn to permit any pressure in the
system to escape. Remove the plug.
Fill the air receiver with oil until the level reaches the filler neck.
Tighten the filler plug.
-
Reset the service warning after carrying out all service actions in the relevant Service Plan.
7.6
Coolers
General
Keep the coolers clean to maintain their efficiency.
Instructions for air-cooled compressors
• Stop the compressor, close the air outlet valve and switch off the voltage.
• Cover all parts under the coolers.
Instruction book
100
API480496
Summary of Contents for GA 37 VSD
Page 1: ...INSTRUCTION BOOK API480496 GA 37 VSD ...
Page 2: ......
Page 14: ...Front view GA 37 VSD up to GA 45 VSD Workplace Full Feature Instruction book 12 API480496 ...
Page 127: ......