41
To eliminate any overheating of the UPS, keep all ventilation openings free
from obstruction and do not place any foreign objects on top of the UPS.
Keep the UPS 15 cm away from the wall.
2.0 INSTALLATION and SETUP
Before installation, please inspect the unit. Be sure that
nothing inside the package is damaged. Please keep the
original package in a safe place for future use.
2.1 Preparation
To guarantee UPS normal operation, before connecting devices to
the UPS, please verify that ground and neural lines of the
connected devices are not short circuited.
If neutral line and ground line are short circuited, please add
isolation transformer between UPS and devices.
Summary of Contents for LinePower 1151
Page 1: ......
Page 54: ...54 60Hz...
Page 57: ...57 Out of bypass voltage range Sounding every second...
Page 70: ...70...
Page 71: ...Atlantis SpA Via S Antonio 8 10 20020 Lainate MI info atlantis land com www atlantis land com...