Technical Manual & Parts Lists
1.3.- Installation & Set Up
It is important that the machine operator read this manual and is familiar with all the functions
and safety concerns of the unit before operating
1.- Unpack the machine frame and install it with help of crane and forklift.
2.- Remove any shipping straps from machine.
3.- Inspect the machine for any damage that may have occurred during shipping. If damage is found,
report this immediately to your supervisor. Document the damage and provide details and photographs.
4.- Install the rollers onto the frame and be sure they can rotate freely.
5.- Install the back safety guard onto the frame.
6.- Adjoin the inner and outer board and install onto the frame, adjust them to in one plane.
7.- Install the front safety guard shield onto the frame.
8.- Install the left and right protective shield onto the frame.
9.- Adjust all rollers to be sure the midlines of them are parallel.
10.- Connect power source and compressed air.
11.- Provide a 220VAC, Three phase, 20 Amp
12.- Provide 3/8" air supply line (90 PSI).
From
the
library
of:
Diamond
Needle
Corp
Summary of Contents for 1393E
Page 2: ...From the library of Diamond Needle Corp ...
Page 16: ...1 2 Technical Data Foot Print From the library of Diamond Needle Corp ...
Page 28: ...b Border Cut Mode From the library of Diamond Needle Corp ...
Page 32: ...c Position Trim Blades From the library of Diamond Needle Corp ...
Page 35: ...Technical Manual Parts Lists d Maintenance Menu From the library of Diamond Needle Corp ...
Page 41: ...Technical Manual Parts Lists f Manual Mode From the library of Diamond Needle Corp ...
Page 59: ...Technical Manual Parts Lists From the library of Diamond Needle Corp ...