Control Box Gen. 2 Setup Guide
9
Overall Installation Procedure
The installation of the Control Box Gen. 2 shall be done in the following order:
Step 1 — Mounting the Control Box
Step 2 — Powering the Control Box
Step 3 — ID Setting and Initialization
ID, Network & License Configuration
Step 4 — Wiring and Connecting Devices
Wiring and Connecting to Devices
Step 5 — Adding the Control Box on VK6000