5. INSTALLATION OF THE MACHINE
1.Preparation
1.
The machine size and weight measurements, given the technical specification sheet.The ground, where the
machine will be placed, should be even, solid enough to bear the weight of the machine
2.
The machine should be located approx. 100 cm away from the rear wall
3.
You can level the machine with adjustable feet (FIGURE 1 NO.1-2) in the bottom part.
4.
Connect MKN 301 (optional) conveyor (FIGURE 1 NO.59) to the saw to the right side surface of the machine
as seen in the FIGURE 1 by using the screws on the machine. Provide the conveyor bobbins and machine top
surface to be the same parallelism by using a sensitive and calibrated water gauge.
5.
Side protective covers (FIGURE 1 NO.55/56)
are sent as demounted. Mount the covers as shown in Figure 1.
6.
Chip collector manifolds (FIGURE 2 NO.15)
are shipped in disassembled form. Install them as shown in Figure
2.
7.
To use manifolds, the absorption flow rate of air for dry chips has to be considered as min. 20m/sec. 28 m/sec
absorption flow rate of air wet chips (>=%18 humidity) can be decided to operate the manifolds.
2.
Connecting to Power Source
1. The Electrical connection must be made by a licensed electrician
2.
The power outlet socket on the machine should be available.
3.
Plug the machine to a grounded socket.
4.
Main voltage of the machine is 220V / 440 V 60 Hz.
24
Summary of Contents for ACK700
Page 2: ...OVERALL DIMENSIONS mm 2 ...
Page 3: ...CUTTING DIAGRAM 3 ...
Page 4: ...PARTS LIST RESİM FIGURE РИСУНОК 1 4 ...
Page 5: ...RESİM FIGURE РИСУНОК 2 5 ...
Page 6: ...RESİM FIGURE РИСУНОК 3 RESİM FIGURE РИСУНОК 4 6 ...
Page 15: ...3UA030030 0005 ANGLE LOCK PIN 1PL040000 0069 GUARD GLASS 15 ...