![AT&T 4 ESS Manual Download Page 206](http://html1.mh-extra.com/html/atandt/4-ess/4-ess_manual_2994836206.webp)
REPLACE METER SOLENOID OPERATE SWITCH, PHASE LOCK SHUNT
SWITCH, OR OSC OS LAMP ASSEMBLY
locking tabs toward body of defective
switch/lamp assembly socket mount and
push defective switch/lamp assembly out
at front of frame, install four
mounting screws at rear of frame
[8] Push four (two top and bottom)
[9] Install new switch/lamp assembly in
[12] With mounting bracket held in place
panhead screws holding rear of
[14] At rear of frame, install six
control cover and four flathead
[13] At front of frame, install NCLK
[15] Depress
to restore
power to clock
chain
ON
pushbutton
AND
front of mounting bracket
mounting bracket
connected by wire wrap
assembly and remove tags
[10] Cut and strip leads to be
NCLK chain control cover
[11] Wire wrap leads to new switch/lamp
DLP
PAGE 2 of 2
234-151-013
515
Issue 8
DEC 1995