![AT&T 4 ESS Manual Download Page 160](http://html1.mh-extra.com/html/atandt/4-ess/4-ess_manual_2994836160.webp)
Pack
replaced
removed
Power
ENABLE/DISABLE
switch to
DISABLE
lamp lights
PWR OFF
AND
AND
[4] If pack is listed in TABLE B, Page 2, remove fuse
Insert and ensure proper seating of
terminals and connector per
[2] If circuit pack being replaced is
in NCSU, position each oscillator
OS
lamps
light
OFF NORM
and
[6] Clean and lubricate pack
approved procedures
[1] See NOTES 1 and 2. Rotate
[5] See NOTE 3. Remove pack
ROS/OFF
switch applicable
[3] Depress
ROS/OFF
switch
to be replaced
to
ROS
replacement pack
REPLACE CIRCUIT PACK (EXCEPT FB211 TYPE)
NOTES
1. Packs at locations
located behind
screw-held covers
of phase lock
2. When packs at
locations 66-31,
15-minute wait is
required before
returning unit to
service to allow
stabilize
-39, and -40 are
which is stuck,
pack up and down
66-31,-33,-34,-37,
ovens
-33,-34,-37,-39,
-40, 78-20 and -52
are replaced, a
to loosen and
pull outward
oven to
3. To remove pack
gently move
incorrectly,
Phase 6 of the
NCSU diagnostic
will fail
4. Settings of DIP
switches on
FG63
and
FG73
packs
switches are set
are important. If
[7] See NOTE 4 and Figures 1 and 2, Page 4.
234-151-013
500
Issue 8
DEC 1995
PAGE 1 of 4
DLP