GigaX Series L2 Managed Switch User Guide
5.1
Power On Self Test
POST is executing during the system booting time. It tests system memory,
LED and hardware chips on the switchboard. It displays system information as
the result of system test and initialization. You can ignore the information until
the prompt, “(
ASUS) %
”, appears (see Figure 43).
Figure 42. CLI interface
73
Summary of Contents for GigaX 2024X
Page 1: ...GigaX Series Layer 2 Managed Switch User Guide ...
Page 24: ...GigaX Series L2 Managed Switch User s Guide Figure 7 IP Setup 24 ...
Page 31: ...GigaX Series L2 Managed Switch User Guide Figure 12 Management 31 ...
Page 33: ...GigaX Series L2 Managed Switch User Guide Figure 13 IP Setup 33 ...
Page 38: ...GigaX Series L2 Managed Switch User s Guide Figure 17 Physical Interface 38 ...
Page 47: ...GigaX Series L2 Managed Switch User Guide Figure 24 Dynamic Address 47 ...
Page 51: ...GigaX Series L2 Managed Switch User Guide Figure 26 Tagged VLAN 51 ...
Page 54: ...GigaX Series L2 Managed Switch User s Guide Figure 28 Cos Queue Mapping 54 ...
Page 62: ...GigaX Series L2 Managed Switch User s Guide Figure 34 USM User 62 ...
Page 70: ...GigaX Series L2 Managed Switch User s Guide Figure 40 Historical Status 70 ...