GigaX Series L2 Managed Switch User Guide
17
3
Quick start guide
This section provides the basic instructions to set up the GigaX environment.
Refer also to the GigaX Series Installation Guide.
Part 1 shows you how to install the GigaX on a flat surface or on a rack.
Part 2 provides instructions to set up the hardware.
Part 3 shows you how to configure basic settings on the GigaX.
Obtain the following information from your network administrator before
proceeding:
IP address for the switch
Default gateway for the network
Network mask for this network
3.1
Part 1 — Installing the hardware
Connect the device to the power outlet, and your computer or network.
Figure 4 illustrates the hardware connections.
3.1.1
Installing the switch on a flat surface
The switch should be installed on a level surface that can support the weight of
the switches and their accessories. Attach four rubber pads on the marked
location on the bottom of the switch.
3.1.2 Mounting
the
switch on a rack
1. Attach brackets to each side of the switch and make the posts insert to
the switch.
2. Insert and tighten two screws to securely attach the bracket to the rack
on each side.
Summary of Contents for GigaX 2024X
Page 1: ...GigaX Series Layer 2 Managed Switch User Guide ...
Page 24: ...GigaX Series L2 Managed Switch User s Guide Figure 7 IP Setup 24 ...
Page 31: ...GigaX Series L2 Managed Switch User Guide Figure 12 Management 31 ...
Page 33: ...GigaX Series L2 Managed Switch User Guide Figure 13 IP Setup 33 ...
Page 38: ...GigaX Series L2 Managed Switch User s Guide Figure 17 Physical Interface 38 ...
Page 47: ...GigaX Series L2 Managed Switch User Guide Figure 24 Dynamic Address 47 ...
Page 51: ...GigaX Series L2 Managed Switch User Guide Figure 26 Tagged VLAN 51 ...
Page 54: ...GigaX Series L2 Managed Switch User s Guide Figure 28 Cos Queue Mapping 54 ...
Page 62: ...GigaX Series L2 Managed Switch User s Guide Figure 34 USM User 62 ...
Page 70: ...GigaX Series L2 Managed Switch User s Guide Figure 40 Historical Status 70 ...