background image

Operating Manual 

 

SECTION 1 

PROTEGE 5442P 

 

112509 Rev G 

Description of Operation 

 

Two  hydraulic  cylinders  raise  and  lower  the  platform.    When  the  "Up"  circuit  is 

energized,  an  electric  motor  operates  a  hydraulic  pump  which  provides  pressurized 

hydraulic  fluid  to  the  cylinders,  causing  the  cylinder  rods  to  extend  and  raise  the 

platform.  When the "Down" circuit is energized, a hydraulic valve is shifted so that the 

fluid  flows  in  the  opposite  direction  through  the  hydraulic  circuit  and  the  platform  is 

lowered. 

 

A gate at each end of the lift permits passengers to enter and leave the platform.  The 

lower landing gate will open only when the platform is lowered all the way.  The upper 

landing gate can be fully opened only when the platform is at the upper landing.  Both 

gates are self-closing. 

 

The height limit sensor is located in the left-hand machinery cabinet.  This switch halts 

the  movement  of  the  platform  when  it  reaches  the  upper  landing,  and  its  adjustment 

must be confirmed every time the lift is relocated. 

 

The motion of the platform is controlled by any of the three operating switches located 

on the right side of the lift.  These are constant-pressure type switches, so that when a 

switch  is  released  the  platform  stops.    It  takes  approximately  40  seconds  for  the 

platform to move through its full range of 42 inches.  These switches are interlocked so 

that while one switch is activated, pressing another switch in the opposite direction will 

not cause the lift to stop; the original action will continue. 

 

The  lift  is  equipped  with  an  under-platform  safety  pan  that  will  halt  all  motion  of  the 

platform if it encounters an obstruction as it descends. If this occurs, use the hand pump 

or  setup  key  to  raise  the  platform  and  allow  for  the  removal  of  the  obstruction.  The 

under-platform safety pan completely covers the bottom and side edges of the platform. 

 

Summary of Contents for 5442P

Page 1: ...OPERATING MANUAL ASCENSION MAESTRO PORTABLE WHEELCHAIR LIFT MODEL 2040T OPERATING MANUAL ASCENSION PROTEGE PORTABLE WHEELCHAIR LIFT MODEL 5442P Patented see www ascension lift com patents...

Page 2: ......

Page 3: ...OPERATING MANUAL ASCENSION PROTEGE PORTABLE WHEELCHAIR LIFT MODEL 5442P...

Page 4: ...Copyright 2018 Ascension a Division of AGM Tucson Arizona This document or parts thereof may not be reproduced in any form by any method for any purpose without the written permission of Ascension...

Page 5: ...rminology 5 Important Safety Information 6 Description of Operation 7 SECTION 2 9 Setup Instructions 9 SECTION 3 13 Operation 13 SECTION 4 14 Installing the Casters for Portability 14 Operating the Li...

Page 6: ......

Page 7: ...uickly set up for use when needed or put into storage when not needed The lift can be used at almost any stage or platform up to 42 inches 1060 mm high About This Manual This manual provides facility...

Page 8: ...ess https ascension lift com lift setup Getting Help If you have a question or problem with the lift review the troubleshooting guide in Section 5 of this manual as well as the comprehensive troublesh...

Page 9: ...sion Ascension s business hours are 8 a m to 5 p m Mountain Standard Time Monday through Friday Telephone 800 459 0400 Mailing Address Ascension Fax 520 881 4983 Customer Service Email sales ascension...

Page 10: ...minute 25 mm s Physical DIMENSIONS 48 wide x 49 high x 61 long 1220 x 1250 x 1550 mm WEIGHT 850 pounds 385 kg MATERIALS Platform base frame gates Mild steel Platform sheet metal safety pans Aluminum a...

Page 11: ...Cabinet The enclosures in which the lifting and control mechanisms are located There is one cabinet on each side of the lift The contents of the machinery cabinets are accessible through the access p...

Page 12: ...d cause the cord to become damaged resulting in electrical shock or fire hazard 6 Set up the lift for operation only in accordance with the instructions in Section 2 of this manual If the lift cannot...

Page 13: ...e left hand machinery cabinet This switch halts the movement of the platform when it reaches the upper landing and its adjustment must be confirmed every time the lift is relocated The motion of the p...

Page 14: ...is located in the right hand machinery cabinet The casters are stored in the left hand machinery cabinet They can quickly and easily be installed underneath the lift so that the lift can be moved to a...

Page 15: ...the disconnect switch to the ON position Raise the platform at least 12 inches 305 mm To do so turn the barrel key in the setup switch on the front of the lift and hold an operating switch up OR use...

Page 16: ...e 2 for identification of the adjustment tool 7 Use the adjustment tool to remove the magnetic optical reflector from the vertical guide rail To do so place the adjustment tool on the reflector turn i...

Page 17: ...t Steps 8 9 until it is correct 11 With the platform at the correct height use the height adjustment tool to reattach the reflector to the vertical guide rail Rest the adjustment tool in the u shaped...

Page 18: ...necessary until the platform stops at the correct height 13 Return the height adjustment tool to the tool holder in the left hand machinery cabinet 14 The lift is ready for use WARNING The lift s stop...

Page 19: ...any one of the three operating switches The operating switches must be held with constant pressure until the platform stops at the upper or lower landing Push the emergency stop button to activate it...

Page 20: ...inet and install them into the color coded sockets located at the corners of the platform underside See Figure 6 and Figure 7 The rigid casters marked yellow must be oriented so the lift will roll for...

Page 21: ...g switch down OR use the manual pump per Section 4 Operating the Lift Without Power Certain option packages incl universal key switches require manual operation 4 Unplug the electrical cord and coil i...

Page 22: ...ter access panel on the right hand machinery cabinet and remove it from its bracket 2 Swivel the pump linkage outward and then insert the hand pump handle into it Figure 8 3 To move the platform upwar...

Page 23: ...on Manual Transportation One person can push the lift on a hard level and smooth surface Two people may be required to push it on a carpeted surface Forklift Transportation On surfaces other than thos...

Page 24: ...roll or step onto the plywood The plywood needs to be very flat for the lift to operate correctly An extension cord may be used with the lift only in accordance with the instructions listed in the fol...

Page 25: ...ON The lift is set up on a level surface less than 5 Both gates are closed The lift will not operate if either one of the gates is open The emergency stop button on the passenger s operating station i...

Page 26: ...Operating Manual SECTION 5 PROTEGE 5442P 20 112509 Rev G NOTES...

Page 27: ......

Page 28: ...Printed in the U S A 112509 Rev G A DIVISION OF AGM...

Reviews: